whatson
  • News
  • DMCC’s Uptown Tower Reaches 150m, Office Structures Completed

DMCC’s Uptown Tower Reaches 150m, Office Structures Completed

null
  • Uptown Tower, the first phase of DMCC’s Uptown Dubai, surpasses 150m
  • Office zone structure has been completed, with completion of the hotel zone structure to follow
  • Over six million man-hours completed without lost time due to injury

 

DMCC – the world’s flagship Free Zone and Government of Dubai Authority on commodities trade and enterprise – has announced that the first phase of their Uptown Dubai district, Uptown Tower, has reached 153m, with over 32 floors completed.

Uptown Tower will stand at 340m once completed, and will feature 188 luxury hotel rooms and suites, exclusive restaurants, extensive conference facilities, Grade A offices, and 229 uniquely designed branded residences. Guided by a smart and sustainable construction strategy, Uptown Tower will be a LEED Gold Certified Building, and home to a state-of-the-art DMCC Business Hub. The hotel and branded residences fit-out packages have recently been awarded to Interiors International Industries LLC.

Significant progress has been made throughout 2020, with the office zone structure of the tower being completed. In the next stage of construction, work is transitioning to the completion of the hotel zone structure. Façade work has commenced through to level 14, and fit out works as well as mechanical, electrical, and plumbing works are ongoing across 29 floors.

Ahmed Bin Sulayem, Executive Chairman and Chief Executive Officer, DMCC, said: “As Uptown Tower moves towards completion, DMCC steps closer to bolstering the world-class business hub that we have created here in Dubai. Having had over 1750 companies join DMCC throughout 2020, the Uptown Dubai district will continue this growth trajectory by attracting additional businesses, residents, and visitors to Dubai through greater commercial appeal and a range of leading residential and leisure offerings.

Uptown Tower is set to sit at the heart of the Uptown Dubai district – a 24-hour neighbourhood brimming with world-class dining, unique high-end retail outlets, a central entertainment plaza and some of the world’s most desirable hotels and leading businesses.

The Uptown Tower team have made incredible progress throughout what has been a challenging year for the entire world. This is made even more impressive given that this progress has been achieved with over six million man-hours without lost time due to injury,” said Paul Ashton, Executive Director - Property, DMCC. “Catering to the ever-growing demand for premium office space in the DMCC Free Zone, the 340m tall centrepiece of the Uptown Dubai district provides a compelling proposition for businesses looking to grow their operations and for individuals wanting to take advantage of the range of amenities on offer,” he added.